Item No. | MRT-2014 |
Description | Multi bender kit 90 degree |
Material | Aluminum Alloy, steel, plastics |
Size | 6,8,10,12,16,19,22mm, 1/4'', 5/16'', 3/8'', 1/2'', 5/8'', 3/4'', 7/8" |
Application | Bending pipes |
Features | Material: This pipe bender is made of strong metal, durable and durable. |
Usually equipped with aluminum wheels, which can be used to bend metal pipes, aluminum wheels can be colored , more obvious, easy to distinguish the size. | |
There is also a basic model, the guide wheel is a fiber wheel, the texture is hard and firm, the weight is lighter, and it is more economical and practical. | |
Kit includes: Includes Tube Bender x 1, Fixing Bracket x 2, Tube Bender Head x 7, Reverse Bending Tool x 1, Tube Cutter x 1, Internal and External Reamer x 1, Carrying Case x 1, Manual x 1. | |
Tube cutter: availabe for 4-28mm, 4-30mm and 4-32mm. | |
Styles with Special Reverse Bender Feature: The reverse bend tool helps bend pipe in both "forward" and "reverse" configurations, allowing it to fit where others cannot. The blow molded hard plastic storage box keeps tools organized and organized, and offers a convenient handle for easy transport and portability. | |
Applicable Pipe: Outside Diameter: 1/4'', 5/16'', 3/8'', 1/2'', 5/8'', 3/4'', 7/8" (6, 8 , 10, 12, 16, 19, 22mm); Applicable pipe wall thickness: 0.6~2mm; Bending angle: 90°; Applicable pipe: only suitable for soft copper/brass pipe. | |
High Efficiency: This pipe bender can be operated with one hand. You can save time and energy and improve work efficiency. | |
Wide range: This pipe bender is designed for bending a wide range of pipes. | |
Application: Durable hardened bending tool designed for bending annealed copper, aluminium, coated annealed copper, widely used in sanitary and heating installations, underfloor heating, refrigeration and air conditioning, hydraulic systems. |
Customization:
ODM and OEM are available. Customer’s logo can be made on the products.
Samples rule:
Samples are out of charge and will be sent within 7 working days.
Production leading time:
35 days after confirmation
FOB port:
Shanghai, China
Payment terms:
30% deposit + 70% T/T before shipping.